This is one of a offshore wind foundation jacket project, according to the drawing, cones and pipes will be produced to be the legs and bracing of jacket. After butt jointed and welding tested, legs will be coated with Jotun primer coating after sand blasting. At the shipyard contractor will carry again the coating according to the requirements.